+
  • cp.12.1.jpg
  • cp.12.2.jpg
  • cp.12.3.jpg
  • cp.12.4.jpg
  • cp.12.5.jpg
  • cp.12.6.jpg
  • cp.12.7.jpg
  • cp.12.8.jpg
  • cp.12.9.jpg

HY - Pipe Clamp Dual-Cassette Shunt Tee -Type

This product is based on a double-clamp repair clamp, with an external threaded straight pipe, switch, and flange.


Subsidiary Classification:

Products


Product Characteristics

This product is based on a double-clamp repair clamp, with an external threaded straight pipe, switch, and flange.It is primarily used for installing various instruments on pipelines, extracting samples, and quickly diverting branch pipelines.There is no need to disassemble the pipeline, enabling rapid pressurized diversion, making it economical and efficient, greatly reducing construction costs.

Applications

Suitable for oil, natural gas, water supply and drainage, mining and other pipeline diversion and outside the pipe construction.

Product Specification

Nominal Diameter

OD (mm)

Applicable Pipes Diameter

ODmin-ODmax (mm)

Applicable Straight Pipe & Flange

OD (mm)

Pressure

WP (bar)

Length

L2 (mm)

Screw

M

Torque

NM

DN32

42  45

≤DN15

32

100

8

15

DN40

48  54

≤DN20

32

100

8

15

DN50

57  60  63

≤DN32

32

140

8

30

DN65

76  80

≤DN40

28

140

8

30

DN80

89

≤DN40

28

203

10

30

DN100

108   114  118

≤DN80

28

203

10

50

DN125

133  140

≤DN100

28

203

12

50

DN150

159  168  170

≤DN125

24

203

12

80

DN200

200  219  

≤DN150

16

255

14

80

DN250

254  273

≤DN200

16

255

14

100

DN300

315  325

≤DN200

16

255

14

100

DN350

355  377

≤DN200

14

255

14

100

DN400

400 406 426  429

≤DN200

14

255

14

100

DN450

478

≤DN200

12

255

14

120

DN500

500  508  530

≤DN200

10

255

14

120

DN550

560

≤DN200

9

255

14

120

DN600

609  630  635

≤DN200

8

255

16

120

DN700

711  720  738

≤DN200

7

255

16

150

DN750

762

≤DN200

7

255

16

150

DN800

812  842

≤DN200

6

255

16

150

DN900

914  920  945

≤DN200

5

255

16

150

DN1000

1016 1020  1048

≤DN200

4

255

16

150

 

Note:

1. Due to so many models and limited pages, larger caliber and special caliber or materials are subject to our client's requirements.

2. Please do not hesitate to contact our after-sales persons for installation instructions and the problems with which you got into trouble while being installed or used and we will reply to you in time.

Explanation video


Close video

Pipe Clamp Dual-Cassette Shunt Tee -Type

FAQ

图片名称

Are you a factory or a trading company?


图片名称
Yes, we are a professional manufacture, founded in 2008.
图片名称

How to place an order?


图片名称
Inquire with us → Customize with drawings or samples → Inform us of usage scenarios → Receive our product design recommendations → Negotiate details → Confirm samples → Sign contract/pay deposit → Mass production → Goods ready → Settle balance/delivery → Further cooperation.
图片名称

What about sample orders?


图片名称
Samples can be provided. Please contact us for details. We can offer you 1 sample for each style for free, the buyer afford the shipping cost.
图片名称

What shipping methods are available?


图片名称
Sea freight, China Express, and express shipping are available. Other shipping methods can also be arranged. Please contact us if you need another shipping route.
图片名称

How long is the delivery production and shipping time?


图片名称
The delivery time depends on the quantity of your order. It usually takes 3-30 working days.
图片名称

Some products are missing from my package. What should I do?


图片名称
Please contact our support team. We will verify your order contents with the packaging and compensate or reship accordingly. We apologize for the inconvenience.
图片名称

How to confirm payment?


图片名称
We accept wire transfers, PayPal, and other payment methods. Please contact us before making payment through other methods. Additionally, a deposit of 30% is acceptable, and the balance should be paid before shipment.

Certificate


Certificate
Certificate
Certificate
Certificate
Certificate

CHARACTERISTICS AND USE

With anti-seismic, anti-impact and noise reduction elements:

The connector and repair device of this type changed the traditional rigid connection to the flexible one favorable to a status in which the pipes are of anti-impact & vibration and denoise.They themselves are resistant to the 350g acceleration impact within 0.02 seconds.By comparison with the flange way, the noise intensity is possible to be lowered by 80%, conducive to the utilization of the entire pipes system in a safe and normal way including the pump, the valve and the instruments, etc. prolonging service life.

 

Reduction in pipes weights:

The reduction in weight is attainable by about 75% compared to the one by flange way.

 

Saving in Pipes space:

Assembly and disassembly process do not require a full-phase construction by flange way, but only screwing the bold from one side, causing a saving of up to 50% both in pipes layout and construction space, being of great significance for the ships with space less available in configurating pipes system rationally.Flexible connection permits alternate angle 10 between the axis of two pipes, deviation angle 6 of single pipe,spacing of up to 5-35mm in pipes end.The loose tolerance limits avert the requirements of a high-precisionassembly,conducive to the promotion of advanced process structure measures such as the construction of the general section and the vibration isolation and noise reduction of the "Floating Raft" in the shipbuilding industry. There is no adverse effect on pipe connectors or repair device arising from the deviation in shipbuilding installment or the shifting made by the navigation.

 

High Cost Performance:

The construction expenses of the connectors and repair device are more economical than that of the flange. The individual cost is slightly higher than that of the general flange, but with long service life and high cost performance. In respect of the copper-nickel and stainless steel pipes, the individual cost is lower than or close to that of the medium diameter copper-nickel and stainless steel flanges.

 

Easy Maintenance:

When the pipes are under repair, even if there are the oil and water in them, no heating process should be done because of the disconnection of the welding, hence away from the danger of the fire or explosion. The rush repairs are applicable to the dual or open or foldable repair devices from outside all kinds of broken pipes in a bandaged way.

 

When our products are applied to the newly laid pipes project, the best economic result is achievable in terms of the manpower, material and financial resources.

lt sunnecessary to do plastic and smooth treatment in special on the end face and surface of the pipes at the construction site, only wipe off the soil for the installation provided there is no special deformation at the end of the pipes.

lt usually takes about 5 minutes to install a connector and only 10-20 minute to operate a repair device online.When working in a confined space in particular, it has more obvious advantages. One or two operators are enoughin general.

Our product is not influenced by the varied pipe materials and can be used effectively while the difference of pipes diameter and axis deflection angle are within specified scope.

APPLIANCE

Product Application
Product Application
Product Application
Product Application
Product Application
Product Application
Product Application
Product Application

Product Message